Kitchen Revamp – Day 6 (and beyond)
Friday, July 17th, 2009 by GabiI know – there is about a 2 months difference between Day 5 and this post (Day 6) of our kitchen remodeling adventure, many things have changed and many delicious dishes were cooked since, but though of bringing things to a partial closure with this post on kitchen remodeling, so we can get on discussing cooking after all.
Popularity: 11% [?]

Basically two days of lightly sanding and then applying oil-based polyurethane. All wrapped up in no more than one hour in the morning, then left to dry at least 24 hours.



Facebook Page
Flickr Photos Sets
Twitter
YouTube
Subscribe to Mamaliga